When can the floor finish be installed?

After 28 days, the screed, reinforced with the Staenis grid, is always ready for tiling with any screed thickness. For parquet, a moisture measurement must be made by the parquet installer before starting installation.

If with underfloor heating, it is mandatory to always let the screed go through a warming cycle before starting tiling the floor.

Climate-neutral floor construction
FIT - Flanders - State of the Art Agentschap Innoveren & Ondernemen Vlaanderen Circulair  content= Made In Belgium EIT Climate-KIC Netwerk Ondernemen PMV