Why does the drainage mortar need to be finished with a layer of screed?
The layer of screed nicely fills all the holes at the top of the installed drainage mortar. This makes tiling easier and significantly reduces adhesive consumption.
The layer of screed nicely fills all the holes at the top of the installed drainage mortar. This makes tiling easier and significantly reduces adhesive consumption.