Insulation screed in Bathroom: Need primer and leveling?
A customer asked whether cement-based leveling compound and primer are necessary for a bathroom, as insulation screed would be directly tileable. Staenis replied that a leveling layer of leveling compound or tile adhesive improves the quality of tiling, but that tiling after applying and drying a primer is also possible. For damp areas such as a bathroom, the entire floor can be made waterproof, but often only the walk-in shower is made waterproof.
More information and options can be found via these links:
For more information about tiling directly onto insulation screed and waterproofing bathroom floors, see the link below.
Discover more about tileable insulation screedGerelateerde artikels:
Install underfloor heating with the Staenis system and insulation screed in a limited height of 9.5 cm. Mill circuits in screed. Contact us for advice!
Find out whether cement-based leveling is required for your screed at Staenis. Choose between tile adhesive or leveling compound for perfect tiles.
Discover the best surface for your terrace with Staenis! Choose drainage mortar for optimal drainage and prevent moisture damage.