Insulation screed in the bathroom: Primer and levelling needed?
A customer asked whether cement-based leveling and primer are necessary for a bathroom, since insulation screed would be directly tileable. Staenis replied that a leveling layer of self-leveling compound or tile adhesive improves the quality of tiling, but that tiling after applying and drying a primer is also possible. For wet areas such as a bathroom, the entire floor can be made waterproof, but often only the walk-in shower is waterproofed.
More information and options can be found via these links:
For more information about tiling directly on insulation screed and waterproofing bathroom floors, see the link below.
Discover more about tileable insulation screed
Gerelateerde artikels:

Install underfloor heating with the Staenis system and insulation screed at a limited height of 9.5 cm. Mill circuits into the screed. Contact us for advice!

Discover whether cement-based leveling is necessary for your screed with Staenis. Choose between tile adhesive or leveling for perfect tiles.

Discover the best subfloor for your terrace with Staenis! Choose drainage mortar for optimal drainage and prevent moisture damage.